I-75 Oakland County Bridge and Road Rehab Project

I-75 Traffic Advisory No. 003

 

June 13, 2019

I-75 between South Blvd and Baldwin Rd, Bridge Repairs and Road Resurfacing

Job Number: 124864

Project Contact: Rob Morosi, 248-483-5107

All closures are weather dependent

 

Closure Updates

Location

Beginning

Ending

Detour Route

SB Baldwin Rd to SB I-75 ramptotal closure (nightly)

06/12/19

9 PM

06/15/19

5 AM

N/A

SB I-75 from Baldwin Rd to Square Lake Rd- 1 lane open (nightly)

06/13/19

9 PM

06/14/19

5 AM

N/A

SB I-75 from Baldwin Rd to Square Lake Rd- 1 lane open

06/14/19

9 PM

06/17/19

5 AM

N/A

 

NB I-75 from Square Lake Rd to Baldwin Rd- 1 lane open

06/14/19

11 PM

06/17/19 5 AM

N/A

 

SB I-75 to EB M-24 connector ramp total closure

06/18/19

12 AM

6/24/19 5 PM

SB I-75 to WB University to NB Opdyke to NB M-24

WB M-24 connector to SB I-75 ramp total closure

06/18/19

12 AM

06/24/19

5 PM

SB M-24 to SB Opdyke to EB University to SB I-75

 

Ongoing Closures

  • NB/SB I-75 2 lanes open between Square Lake Rd and Baldwin Rd through early August
  • NB/SB I-75 2 lanes open between Square Lake Rd and Chrysler Dr through October
  • NB/SB Baldwin Rd 1 lane closed at I-75 closed through late June
  • NB/SB Joslyn Rd 1 lane closed at I-75 closed through early August
  • NB/SB Joslyn Rd ramps to NB I-75 closed through early August
  • SB I-75 to SB Joslyn Rd ramp closed through early August
  • SB I-75 to EB M-59 ramp closed through October
  • NB I-75 to WB M-59 ramp closed through October
  • WB M-59 to SB I-75 ramp closed through October
  • EB M-59 to B I-75 ramp closed through October

More information can be found at www.michigan.gov/drive