I-75 between South Blvd and Baldwin Rd, Bridge Repairs and Road Resurfacing


I-75 Traffic Advisory No. 011

 

August 15, 2019

I-75 between South Blvd and Baldwin Rd, Bridge Repairs and Road Resurfacing

Job Number: 124864

Project Contact: Rob Morosi, 248-483-5107; MDOT-I75AuburnHills@michigan.gov

All closures are weather dependent

Closure Updates

Location

Beginning

Ending

Detour Route

SB Baldwin Road ramp to SB I-75 CLOSED

8/16/19

5 AM

8/18/19

2 PM

n/a

SB I-75 at Baldwin Road one lane closed, TWO LANES OPEN

8/16/19

5 AM

8/16/19

7 PM

n/a

SB I-75 from Giddings Road to South Boulevard TWO LANES OPEN

 

8/16/19

5 AM

08/22/19

5 PM

n/a

SB I-75 at Baldwin Road two lanes closed, ONE LANE OPEN

8/16/19

7 PM

8/18/19

2 PM

n/a

Chrysler Road ramp to NB I-75 CLOSED

8/23/19

5 AM

9/6/19

5 PM

Featherstone Road to SB Squirrel Road to WB M-59 to NB I-75

 

 

Ongoing Closures

  • NB/SB I-75 2 lanes closed, 2 lanes open between Pontiac Rd and Square Lake Rd through October
  • NB I-75 ramp to Chrysler Drive closed through late August
  • SB Chrysler Rd ramp to SB I-75 1 lane closed through mid August
  • SB Joslyn Rd ramp to NB I-75 closed through late August
  • SB I-75 to EB M-59 ramp closed through October
  • NB I-75 to WB M-59 ramp closed through October
  • WB M-59 to SB I-75 ramp closed through October
  • EB M-59 to NB I-75 ramp closed through October
  • EB and WB M-59 at I-75 2 lanes closed, 1 lane open daily Mon-Fri 9 am to 3 pm 8/12-8/16 and 8/19-8/23
  • NB and SB I-75 3 lanes closed, 1 lane open nightly 8 pm to 5 am Sunday-Thursday nights, through end August

More information can be found at www.michigan.gov/drive